Ormat Technologies Inc. (ORA) announced today that it commenced commercial operation of the company’s first-ever geothermal and solar hybrid project, a 7MW AC solar expansion of its Tungsten Mountain geothermal project in Churchill County, Nevada. The Tungsten Solar expansion commenced commercial operation in July 2019.
The electricity generated from the Tungsten Solar power plant will be used to offset the equipment’s energy use at the Tungsten geothermal facility, thus increasing the renewable energy delivered by the project under the Southern California Public Power Authority (SCPPA) portfolio contract.
SCPPA and Los Angeles Department of Water and Power (LADWP) had the vision to enable this development through their innovative portfolio contract, which sought to maximize the output of their renewable facilities, furthering the transition away from coal power while maintaining a reliable power supply for Los Angeles.
Key data points: The market size in 2031 = $984.6 million, growth forecast = 5.2% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities, and forecasts in the global thin film chip resistor market to 2031 by type (ultra precision 0.05% tolerance, 0.1% tolerance, 1% tolerance, and others), application (instrumentation, medical instruments, power supply, electric power equipment, electronic digital products, and others), end use industry (industrial equipment, consumer electronics, and others), and region (North America, Europe, Asia Pacific, and the Rest of the World)
Download free sample pages“Our first hybrid project provides a roadmap for future expansions, as Ormat continues to transition from a leader in geothermal energy to a leader in the broader renewable energy sector,” said Isaac Angel, Ormat’s CEO. “We leveraged our expertise to expand the capacity at minimal cost, providing consumers with additional renewable energy.”