ROSATOM's Wind Power Division has received approval from the Ministry of Construction of the Republic of Dagestan to build the Novolakskaya WPP with a total capacity of 300 MW.
The approval was preceded by a positive expert evaluation of the design documentation and the results of the engineering survey for the construction of a wind power plant consisting of 120 wind turbines with a capacity of 2.5 MW each.
The successful completion of the expert assessment confirms that the design documentation for the construction facilities complies with the results of the engineering survey and the requirements of all technical regulations, including environmental, sanitary, epidemiological and fire safety regulations, as well as regulatory and technical documentation and the City Planning Code of the Russian Federation.
Global and Regional Share, Trend, and Growth Opportunity Analysis Report Coverage: By Product Type, Carbon Nanotubes, Graphene, Carbon Fibers, Carbon Foams and Others), Application (Electronics and Semiconductors, Energy Storage (Lithium-Ion Batteries, Fuel Cells, Solar PV Cells, Hydrogen Storage, Electrochemical Supercapacitors, and Others), Structural Composites (Sporting Goods, Wind Turbine Blades, Light Vehicle or Automotive, Construction and Infrastructure, and Aerospace and Defense), Chemical Materials and Polymers (Coatings Adhesives and Sealants, Water Filtration, Catalysts, and Others), Medical (Transdermal Drug Delivery, Cancer Treatment, Proteomics, and Others), and Others), and Geography
Download free sample pages