Eolus has signed an agreement with Siemens Gamesa for the delivery of seven wind turbines comprising 30 MW for construction in wind farm Stigafjellet in Norway.
The seven wind turbines of the model SWT-DD-130 has a capacity of 4.3 MW each and will be constructed in wind farm Stigafjellet, located in Bjerkreim south of Stavanger. The wind farm is covered by a sales agreement with ewz that was made public by press release in July 10, 2018. Commissioning is planned for the second half of 2020.
A five-year full-service agreement has also been signed with Siemens Gamesa.
Key data points: The market size in 2031 = $3 billion, growth forecast = 10.1% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities, and forecasts in the global wind power coatings market to 2031 by type (polymer coatings, metal coatings, and ceramic coatings), technology (water-based, solvent-based, powder, and UV-cured), application (onshore, offshore, and others), and region (North America, Europe, Asia Pacific, and the Rest of the World)
Download free sample pages