Alterra Power Corp. (TSX: AXY) is pleased to announce the receipt of a US$3.5 million return of capital from the Shannon project representing unused contingency following retirement of the construction loan. Alterra expects up to US$1.0 million in further such funds pending the resolution of certain construction insurance-related matters. Regular operating distributions from the project are expected to commence in early 2016.
by Type (Scheduled Maintenance, Unscheduled Maintenance), Location type (Onshore, Offshore), Turbine Connectivity (Grid-connected, Standalone), and Region
Download free sample pages