Alterra Power Corp. ("Alterra") is pleased to announce that in 2016 it commenced on-site and off-site project activities intended to qualify several wind projects for USA renewable tax incentives (production tax credits, or "PTCs"), including the 200 MW Flat Top project.
The estimated generation capacity for the qualifying projects is between 1,200-1,700 MW, with intended project locations in multiple states. The group of projects consist of projects fully owned by Alterra as well as projects owned by other wind developers with whom Alterra is working toward project acquisition or partnership.
"We've made significant progress this year stocking our pipeline with early and late-stage development projects," said John Carson, Alterra's CEO. "We intend to continue our project acquisition and greenfield development efforts in 2017."
Key data points: The market size in 2031 = $3 billion, growth forecast = 10.1% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities, and forecasts in the global wind power coatings market to 2031 by type (polymer coatings, metal coatings, and ceramic coatings), technology (water-based, solvent-based, powder, and UV-cured), application (onshore, offshore, and others), and region (North America, Europe, Asia Pacific, and the Rest of the World)
Download free sample pages