The technology group Wärtsilä will supply Mexico’s state-owned electricity utility, Comisión Federal de Electricidad (CFE), with two sizeable multi-fuel power plants having a combined output of 600 MW. The order was earlier announced in Wärtsilä’s stock exchange release on 10 November 2021. Wärtsilä will deliver the projects on a complete engineering, procurement, and construction (EPC) basis. Jointly these projects represent the largest generating capacity EPC contract ever awarded to Wärtsilä. The order is included in the company’s Q4 order intake.
The projects comprise a 400 MW facility, the Mexicali Oriente power plant located in Mexico’s Baja California state, and the Parque Industrial plant, a 200 MW generating unit in Sonora, Mexico. The Mexicali Oriente plant will operate with 24 Wärtsilä 50DF dual-fuel engines, while the Parque Industrial plant will feature 22 Wärtsilä 34DF dual-fuel engines. The engines will run primarily on gas with the capability to use liquid fuel as a backup if required.
The awarded projects clearly indicate the demand that exists for power plants of this size operating with flexible internal combustion engines. During the summer months, the plants will operate continuously, meeting the high electricity demand in the region when temperatures can reach +50 °C. For the remainder of the year, they will be used to provide a grid balancing service.
Key data points: The growth forecast = 7.8% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities, and forecasts in the global small seawater desalination system market to 2031 by type (less than 500 GPD, 500-1000 GPD, and more than 1000 GPD), application (processing and manufacturing, food and beverage, and other), and region (North America, Europe, Asia Pacific, and the Rest of the World)
Download free sample pages“We are honoured to have been awarded these valuable contracts, jointly biggest ever for Wärtsilä Energy. It speaks of the value created by our state-of-the-art flexible power generation solutions, which provide a unique combination of energy efficiency, and fuel and operational flexibility, supported by high reliability,” said Sushil Purohit, President, Wärtsilä Energy, and Executive Vice President.
“Wärtsilä’s experience with EPC deliveries, its ability to deliver on a fast-track basis, and the efficiency of the company’s engine technology were key considerations in the contract award,” commented Risto Paldanius, Vice President, Americas, Wärtsilä Energy. “The power plants will serve the local needs today, and they will adapt to future needs.”
To date, Wärtsilä has delivered over 500 MW of power plant capacity in Mexico, of which 380 MW are currently covered by Wärtsilä long-term service agreements.