Gazprom Dobycha Tambey Limited Liability Company, a joint venture established on a parity basis by Gazprom Nedra (a wholly-owned subsidiary of Gazprom) and RusGazDobycha, was registered today.
The joint venture will develop and provide for the pre-development of the Tambeyskoye field in the Yamal Peninsula, with gas production scheduled to start in 2026. The subsurface use licenses for the areas where the field is located will be handed over by Gazprom Nedra to Gazprom Dobycha Tambey in 2022.
Gas contained in Tambeyskoye is characterized by high ethane content. This is why the field, along with the fields of the Nadym-Pur-Taz region, will become the resource base for the Complex for processing ethane-containing gas near the settlement of Ust-Luga in the Leningrad Region.
Forecasts by Application (Onshore Oilfield, Offshore Oilfield), by Solution (Hardware, Software & Service, Data Storage), by Process (Reservoir Optimization, Drilling Optimization, Process Optimization, Safety Management, Other) AND Regional and Leading National Market Analysis PLUS Analysis of Leading Companies AND COVID-19 Recovery Scenarios
Download free sample pages
Source: Gazprom
Date: Nov 2, 2021