ScottishPower Renewables, the renewable energy subsidiary of the Iberdrola Group in the United Kingdom, has completed the laying of the first section of the export cable for its East Anglia THREE offshore wind farm, reaching a new milestone in this clean energy project valued at around €4.7 billion.
The cable has been connected to shore at Bawdsey, Suffolk (UK). The electricity generated offshore will travel approximately 147 kilometres from the wind farm to the coast. From there, the energy will travel another 37 kilometres by land to the HVDC converter station at Bramford, near Ipswich, using the infrastructure previously developed for East Anglia ONE.
East Anglia THREE will have a capacity of 1.4 gigawatts (GW) and, once operational at the end of 2026, will become the Iberdrola Group's largest wind farm and one of the largest in the world, with the capacity to supply more than one million homes.
Key data points: The growth forecast = 5.5% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities and forecasts in high speed turbine dental handpiece market to 2031 by type (pneumatic and electric), application (hospitals and dental clinics), and region (North America, Europe, Asia Pacific, and the Rest of the World)
Download free sample pages