AtomEnergoPromSbyt pilots a load dispatch centre for Rosatom
Stay informed with our
free newsletters

Aug 16, 2022

AtomEnergoPromSbyt pilots a load dispatch centre for Rosatom's wind power division NovaWind

NovaWind, AtomEnergoPromSbyt and WindSGC launched a load dispatch centre (LDC) as part of their joint project to centralise short-term forecasting of power generation at wind farms. Operating 24/7, LDC will submit real-time power output forecasts to the wholesale electricity and capacity market operator and perform a number of other functions, such as wind farm performance analysis.

LDC uses a set of proprietary technical solutions developed at NovaWind and AtomEnergoPromSbyt to enable real-time telemetry data acquisition from every wind turbine.

“The primary function of LDC is to improve the overall performance of Rosatom’s wind power division by making short-term generation forecasts more accurate. This is what we target with our innovative decision support system that uses advanced data analysis algorithms, including machine learning, to forecast power output,” says Sergey Soldatov, LDC Head at AtomEnergoPromSbyt.

Car Audio Market Size, COVID-19 Impact Analysis, Regional Outlook, Price Trends, Competitive Market Share & Forecast, 2022 - 2030

Car Audio Market Size, COVID-19 Impact Analysis, Regional Outlook, Price Trends, Competitive Market Share & Forecast, 2022 - 2030

By End-Use (Industrial, Housing, Power & Energy {Wind Energy, Solar Energy, Hydroelectric Power}, Consumer, Civil Engineering, Automotive, Aerospace), By Component Type (Speaker {2-Way Speaker (Component, Coaxial), 3-Way Speaker (Component, Coaxial), 4-Way Speaker}), Amplifier, DSP), By Sound Management (Voice Recognized, Manual), By Make Type (Branded/Premium Audio System, Non-Branded Audio System), By Vehicle Type (Passenger Car, Commercial Vehicle), By Sales Channel (OEM {Speaker, Amplifier, DSP}, Aftermarket {Speaker, Amplifier, DSP})

Download free sample pages

It is planned that LDC will operate in a pilot mode for the next two months. This time is spared to finish on-site training of LDC staff (dispatchers and data analysts), have dispatching regulations approved, and refine the data management, software and technical solutions employed.


NovaWind