The Hollandse Kust Zuid wind farm, which is currently under construction, has successfully generated its first electricity.
While still in their testing phase, the first operating turbines are already producing electricity, which is transferred to shore via an offshore transformation station and fed into the Dutch grid.
The wind farm is located in the North Sea about 18-35 kilometers off the coast between The Hague and Zandvoort and is owned by BASF, Vattenfall and Allianz.
Key data points: The market size in 2031 = $3 billion, growth forecast = 10.1% annually for the next 7 years. Scroll below to get more insights. This market report covers trends, opportunities, and forecasts in the global wind power coatings market to 2031 by type (polymer coatings, metal coatings, and ceramic coatings), technology (water-based, solvent-based, powder, and UV-cured), application (onshore, offshore, and others), and region (North America, Europe, Asia Pacific, and the Rest of the World)
Download free sample pagesSo far, 36 turbines have been installed. When fully operational in 2023, Hollandse Kust Zuid will be the largest subsidy-free offshore wind farm in the world with 140 turbines and an installed capacity of 1.5 GW.