This news is classified in: Sustainable Energy Wind
May 18, 2020
GE Renewable Energy announced today that it has been selected by Fina Enerji to supply 52 of its 3 MW platform onshore wind turbines for four wind farms in Turkey: Baglama, Tayakadin, Yalova and Pazarkoy. With a total capacity of 193 MW, the wind farms will produce enough clean energy to power the equivalent 195,000 homes, save about 650,000 tons of CO2 and support Turkey’s renewable energy target. The scope also includes a 10-year servicing agreement.
GE already has an installed base of 1.2 GW of wind energy in Turkey and has built 500 wind turbines built in the country, including the 350 MW of onshore wind energy projects that Fina Enerji and GE Renewable Energy have built together.
Murat Özyegin, Chairman of the Board of Fiba Group, the owner of Fina Enerji, said: “We are excited for our new wind farm projects that will increase our installed capacity from 350 MW to 543 MW. Baglama Project will be the easternmost wind farm investment in Turkey and we are particularly proud to contribute to the economic development in this region. We are pleased to sustain our partnership with GE and to contribute to our country's renewable energy targets.”
by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application
Download free sample pagesGE Renewable Energy will produce the wind turbine blades in its LM Wind Power’s Bergama site, Izmir, Turkey, where GE has more than 550 employees. Towers will also be produced in the country.