The Nordex Group to Install a 198 MW Wind Farm in the USA
Stay informed with our
free newsletters

This news is classified in: Sustainable Energy Wind

May 28, 2019

The Nordex Group to Install a 198 MW Wind Farm in the USA

The Nordex Group has received an order from an international project developer in the United States. Starting in the spring of 2020 the company will be installing a wind farm with 63 AW125/3150 turbines with a combined rated output of 198 megawatts. The order utilizes some equipment from a "safe harbor" transaction dating back to 2016. The Nordex Group received advance payment for these components and produced them in the same year. Through the 5% Safe Harbor qualification, "Safe harbor" equipment purchased in 2016 can qualify customers' projects for the 100% Production Tax Credit if placed in service by the end of 2020.

The project is being built in Texas. With a hub height of 87.5 metres, the turbines are being installed on steel towers.

Green Hydrogen Market - Global Forecast 2024-2030

Green Hydrogen Market - Global Forecast 2024-2030

by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application

Download free sample pages

Nordex