This news is classified in: Sustainable Energy Wind
Dec 18, 2018
Hamburg, 18 December 2018. The Nordex Group is ramping up its presence further in the growth market of Argentina with a follow-up order from its customer AES Generación S.A. The "Vientos Neuquinos" wind farm comprises 24 AW132/3465 turbines and is to be built in the province of Neuquén in the south-west of Argentina. AES Generación S.A. has also ordered service for the turbines covering a period of at least two years.
As recently as September 2018 AES Generación S.A. placed an order with Nordex for the supply of 30 turbines AW132/3300 for the “Energética” wind farm. As in this case, the turbines and the 120-metre concrete towers for "Vientos Neuquinos" will be produced locally in Argentina.
by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application
Download free sample pages