Alterra Power Announces Execution of Project Contracts for F
Stay informed with our
free newsletters

This news is classified in: Sustainable Energy Wind

Jan 5, 2017

Alterra Power Announces Execution of Project Contracts for Flat Top Wind Farm

Alterra Power Corp. is pleased to announce the execution of several project contracts at Flat Top, a 200 MW wind development project in central Texas. Contracts executed within the last week include:

Turbine supply agreement with Vestas-American Wind Technology, Inc. to supply 100 V110-2.0 MW wind turbines, which are part of the Vestas 2 MW turbine platform, one of the most well-proven turbines in the industry;

  •     10-year service and maintenance agreement with Vestas, which provides similar services at Alterra's Dokie wind farm; and
  •     Construction services agreement with Blattner Energy, Inc., a top-tier EPC contractor that built the nearby Logan's Gap wind farm.

Alterra is also currently negotiating a power hedge as Flat Top's primary revenue contract.

Green Hydrogen Market - Global Forecast 2024-2030

Green Hydrogen Market - Global Forecast 2024-2030

by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application

Download free sample pages

Alterra Power Corporation