This news is classified in: Sustainable Energy Wind
Dec 8, 2016
The order includes V126-3.45 MW and V117-3.45 MW turbines with Power Optimized Mode to 3.6 MW and adds to Vestas’ 3 MW-platform’s growing presence in the U.S.
The order includes supply and commissioning of the wind turbines as well as a five-year Active Output Management 5000 (AOM5000) service agreement: Vestas’ full-scope service package maximizing uptime and energy production.
Turbine delivery is expected in 2017.
by Technology (Alkaline Electrolyzer, Polymer Electrolyte Membrane (PEM) Electrolyzer), Renewable Source (Solar Energy, Wind Energy), Distribution Channel, Application
Download free sample pagesCustomer and project names have not been disclosed at the customer’s request.